The decoration cost of the clean room project is relatively high. The factory spends such a high cost, and the requirements for it are naturally high. First of all, when selecting the project site, it is necessary to select an area with no air pollution, and there will be no large amount of dust particles around. Such an environment can reduce the load of the clean room air conditioning system and reduce the cost of clean room operation. Because the factory has strict requirements on the cleanliness of the clean room project, which is specifically reflected in the amount of bacteria and dust in the air. The smaller the content, the lower the clean room level and the more difficult the decoration. If the clean room project wants to meet the relevant grade requirements, it is necessary to do a good job in the design and installation of the air conditioning control system, and do a good job in the quality control of the decoration materials to reduce the generation of harmful gases in the decoration. The air conditioning system can control the temperature, humidity and pressure in the clean room through the frequency and size of the air change. At the same time, it is ensured that the content of various bacteria and dust in the air can meet the requirements of clean room engineering. At present, according to different industries, different clean room grades, there will be slight differences in engineering requirements. For example, ordinary clean room engineering needs to comply with the requirements of GB50073-2001, the decoration requirements of hospitals for clean rooms should comply with GB50333-2002, and pharmaceutical factories should comply with the regulations of GB50457-2008. In order to meet the various requirements in the clean room project, the decoration company needs to have very professional decoration technology and professional and advanced decoration equipment. They must submit relevant qualifications and certificates, and apply for the corresponding decoration qualifications in order to obtain the qualifications for the renovation of the solution room. At the same time, in daily life, it is necessary to learn more advanced decoration techniques in the industry to improve the skills of decoration personnel. Specialize in the clean room industry for many years. WONZONE
Purification engineering has become an indispensable industry in today's society. Purification decoration is used in many fields. So what are the requirements for doors and windows in the implementation of this project? 1. The purification and decoration project is an integral part of the enclosure structure. In addition to the requirement of airtightness, it also requires the surface to be flat and smooth, without dust accumulation, just like the wall. The glass of double windows should be flush with the inner and outer walls respectively. When metal beading is used for single-glazed windows, the metal beading should be made into an arc shape or have a certain slope to facilitate cleaning and not easy to install a window sill. 2. The sealing materials for clean room doors and windows include rubber strips, silicone rubber, sealants, and single and double-sided pressure-sensitive adhesive strips, etc. 3. The gaps between doors and windows are roughly divided into fixed gaps and movable gaps. Fixed gaps, such as those of fixed windows, are easier to handle, and you can use "one-and-for-all" sealing materials; movable gaps, such as the gap between door leaf and door frame, cannot be treated like fixed gaps. It depends on the material, quality, opening frequency, and With thresholds, whether it is directly connected to the outside air, etc., comprehensively consider the door leaf, door frame, hardware material, sealing strip and its action mode, and make corresponding design in advance. Professional clean room manufacturer, mainly dedicated to the production and research and development of clean room engineering, equipment, materials, etc.
The clean room ceiling system is designed according to the characteristics of the clean room. It has simple processing, convenient assembly and disassembly, and is convenient for daily maintenance after the clean room is built. The ceiling system is modular in design and has large plasticity, which can be factory-produced or cut on site. The pollution of processing and construction is greatly reduced. The system has high strength and can walk on it. It is especially suitable for high-clean areas, such as electronics, semiconductors, and medicine. industry. Ceiling system composition: 1.T-bar: 1) T-shaped structure, dry ceiling, anode aluminum material, surface electrophoresis treatment. 2) Sprinklers, smoke detectors and lighting wires can be installed at the T-bar cross joint 3) Clean room teardrop lighting can be installed under the T-bar 2. Connector: 1) The connecting parts include cross joints, T-shaped joints, corner joints, and zinc alloy materials. The entire system is screwed together to form a whole. 2) Galvanized full wire suspension rod, with adjuster to adjust the height of the ceiling, connected by clamps and nuts. 3) All screws and nuts are galvanized 3. System scalability: high efficiency filters, FFU, etc. can be easily installed. To Clean room FFU ceiling connection node 1. Check the baseline—check the datum level—prefabrication of boom—stake out boom installation—installation of boom—prefabrication of ceiling keel—installation of ceiling keel—level adjustment of ceiling keel—position of ceiling keel—installation of cross reinforcement piece—measurement of abnormal keel Dimensions—Interface closing—Ceiling keel gland installation—Ceiling keel level adjustment 2. check the baseline A. Be familiar with the drawings carefully, and confirm the construction area and the position of the cross reference line according to the relevant data. B. Check the ceiling reference line with theodolite and laser level. 3. Check the reference elevation Determine the elevation of the ceiling according to the ground or raised floor 4. Boom prefabrication A. According to the floor height, calculate the length of the boom required for each ceiling height, and then cut it. B. After processing, the boom that meets the requirements is pre-assembled with the square regulator and other accessories. 5.Installation of boom: After setting out the boom, install the boom in a large area according to the position of the boom, and fix it on the airtight ceiling keel through the flange anti-slip nut. 6.prefabricated ceiling system When the keel is prefabricated, the protective film cannot be removed, the hexagon socket screws need to be tightened, and the pre-assembly area is moderate. 7.Ceiling keel installation The prefabricated ceiling keel is hoisted onto the T-shaped screw pre-assembled by the boom, the square adjuster is offset from the center of the cross joint by 150mm, and the T-shaped screw and flange anti-slip nut are...
The slot-sealed flat-closed clean room door of the door and fan of the open clean room is the most commonly used type of clean room door in the clean workshop. It is usually used for traffic or transportation, and is very convenient for emergency evacuation in case of fire, which is very convenient. The elastic material of the forming section is usually chosen as the sealing strip to fix and seal at the state of the seam. The opening width of common sliding doors clean room is less than 1800 mm in double inner clean room doors and 2100 mm in double outer clean room doors, and the height of the opening is in the range of less than 2400 mm. The setting of the sealing strip. In the case of frequent opening and closing of the doors and fans of clean rooms, it excepts the following situations:some outside clean rooms door and windows, which may install the sealing strips on the doors and fans of clean rooms to avoid the transportation of the heavy equipment , or some doors of inner clean rooms are not allowed to set the doors of clean rooms on the ground because of workshop transportation, and only suspended sweeping can be installed at the bottom of the doors and fans of clean rooms close to the ground. In general, in order to avoid the hand model, foot step or car collision as far as possible, and less affected by the operation and transportation, the small section forming sealing strips of several millimeters in length and width is laid on the concealed groove part of the door lift of the clean room, and then tightened by the closure of the door fan of the clean room. The sealing strip should be laid continuously along the periphery of the movable gap in order to form a trapped and closed ring sealing line after the door of the clean room closes. When the sealing strip is set at the door building and the door fan of the clean room respectively, it is necessary to pay attention to the good connection of the pottery and minimize the small gap between the airtight strip and the crack of the clean room doors and windows. Welcome to choose and buy the clean room equipment produced by Wonzone clean room doors and windows factory.
The building structure In construction, we only need to pay attention to: For the masonry construction within the scope of clean room, the quality control grade should meet the A level requirement of the current national standard "Masonry Engineering Construction Quality Acceptance Code" GB50203 Article 3.0.10. In the construction of steel structure in high and large clean space, the dimension deviation of components should be strictly controlled. For the joints that do not require crevice in design, we should be sealed with sealing materials after the qualified acceptance of the main body of the steel structure. The anticorrosive and fireproof coatings on the surface of steel structures shall not be leaked to paint. Architectural decoration Architectural decoration is divided into six aspects (i.e. floor, wall, ceiling, corner,clean room door and window, gap sealing) to achieve the clean requirements. First of all, from the material point of view, in addition to meeting the requirements of heat insulation, sound insulation, vibration protection, insect prevention, anti-corrosion, fire prevention, anti-static and other requirements, the clean room construction materials should also ensure that the air tightness of clean rooms is well and decorative surfaces do not produce, absorb, and accumulate dust, and it should be easy to clean. Secondly, the clean room construction materials project should implement the closed and clean management of the construction site, and effective measures should be taken to prevent dust diffusion when dust operation is carried out in the clean construction area.
1. Cleaning of the clean room should be done before the end of the day and after the end of the process operation. 2. Cleaning should be carried out in the operation of clean room air conditioning system. 3. After cleaning, the air-conditioning system will continue to operate until the required cleanliness level is restored, generally not less than the self-cleaning time of the clean room. 4. Sweeping mops and rags should not be made of easy-to-remove fabrics. They can generally be made of long-fibre materials or polyurethane sponges. 5. In order to prevent cross-contamination, clean rooms with different cleanliness levels should have their own special cleaning supplies, and garbage should be put into dustproof bags (plastic bags) and taken out. 6. Clean room cleaning detergent can be prepared by adding 30 g neutral residual liquid detergent per liter of water. 7. Purified water should be used instead of tap water for cleaning high-level clean rooms. Disinfectants used should be replaced regularly to prevent microorganisms from developing resistance to antibiotics. 8. When large objects are moved into a clean room, they should be cleaned initially by vacuum cleaner in general environment, and then further treated by vacuum cleaner or wiping method in quasi-clean room. During the period when the clean room purification system stops operating, large objects are not allowed to be moved into the clean room. 9. Small items that need to be brought into the clean room should be wiped and cleaned in the quasi-clean room first, and then brought in through the transfer window or into the handling box. 10. Fire fighting equipment, safety doors and safety passages in the clean room should be clearly marked, and staff members should be familiar with their locations. Safety doors must be open at any time, and no debris should be piled up in safety passages. Safety fire protection facilities should be checked regularly. 11. When a fire alarm occurs in a clean room, an alarm should be issued immediately, the fan and all equipment in the clean room should be closed, and the power supply and flammable gas access should be cut off. (System and fire alarm equipped with fire valve or fire switch will automatically shut down the fan and need manual reset afterwards. Welcome inquiry clean room partition systems、cleanroom wall panels 、clean room false ceiling、clean room doors&windows etc.