More than 80% of the quality problems in the construction of epoxy wear-resistant floors and curing agent floors are caused by construction technology. Therefore, during the coating process, attention should be paid to the construction specifications and precautions, and the project management personnel should perform the construction on the construction site. The construction technology and engineering quality of the personnel are monitored, and the quality must be paid attention to every coating applied. Only by controlling the quality, can we paint high-quality epoxy floor projects.
The construction of epoxy abrasion-resistant floor and curing agent floor is most likely to cause problems and quality problems, which are generally based on basic ground treatment, material quality selection and deployment, tool use, construction personnel technology and construction environment grasp Check five aspects such as management and management, and pay attention to precautions when painting to avoid quality problems.
How to solve the 5 major problems of epoxy floor paint construction:
1. Basic ground treatment: A good substrate is a guarantee for a good epoxy floor paint coating. It is recommended that a technical engineer guide the construction on site during the foundation treatment, including the degree of foundation sanding, the level of flatness, and the leveling of cracks. Repair and treatment, removal of oil stains and other procedures must be performed in accordance with standard operations. After the treatment is completed, check the quality of the substrate to avoid poor quality effects and poor epoxy floor paint coating effects.
2. Material quality selection and deployment: all epoxy floor paint materials used must be strictly inspected and configured, and all floor materials must be inspected to prevent the use of unqualified products; secondly, the comparison of the deployment of materials before construction , Weighing, mixing time and mixing method must be properly controlled.
3. Use of tools: When choosing construction tools, you must choose suitable rollers, spray guns, paint brushes, masking paper and other tools and auxiliary equipment to avoid final quality problems caused by poor floor construction tools; construction personnel must be familiar with the construction Correct use of equipment and tools and skilled operation of construction tools.
4. Construction personnel skills: Each construction personnel must be trained on the job position, and the construction personnel in various places should master the various technical indicators and construction methods familiar with the construction process. Blind construction and brutal operation are absolutely not allowed.

5. Grasp and management of the construction environment: The grasp of the construction environment refers to the monitoring and management of the current temperature, humidity and environmental sanitation of the construction, by the management personnel of the construction site must carry out good construction with the general contractor and each subcontractor In cooperation with the work, strict on-site management must be carried out on the floor paint construction personnel and the on-site management system must be clarified.


Committed to the clean room industry of  cleanroom ceiling tilesdemountable modular wall panel systempharmaceutical clean room door and sandwich panels hpl etc.

 